Dilapidation report cost in Australia
Dilapidation report typically costs $400 to $1,200 per job in Australia in 2026, GST inclusive. The exact price depends on the size of the job, access, materials and where you are.
Reviewed September 2026 by the Blue Collar News Services editorial team. Price ranges are our own estimates. The rules and wages quoted cite their source (2 sources, listed at the end). Indicative prices, not quotes, and not legal advice. How we research prices
What this price usually covers
Document the condition of neighbouring properties before construction to protect against disputes.
Typical jobs in this range:
- Dilapidation report before excavation
- Document neighbour properties pre-build
- Condition report for council conditions
What affects the price
- The size and complexity of the job
- The size, age and type of the property
- Access to the roof space, subfloor and outbuildings
- How detailed the written report has to be
- Whether it is urgent or after hours
- Where you are: metro and regional rates differ
What sets inspections & compliance prices
The rules, rates and price movements for the trade that bear most on this job, each with its source. Checked September 2026; confirm with the authority before relying on one. All inspections & compliance rules and prices.
Queensland's QBCC completed residential building inspection licence covers inspecting a completed building and preparing a report in accordance with AS 4349.1-2007 (pre-purchase inspections of residential buildings). Applicants need 5 years' experience and professional indemnity insurance.
Source: qbcc.qld.gov.au
In Queensland a pool safety certificate from a QBCC-licensed pool safety inspector is valid 2 years for a non-shared pool and 1 year for a shared pool. There is no set inspection fee, and a pool that fails must be re-inspected within 3 months by the same inspector.
Source: qbcc.qld.gov.au
Dilapidation report cost by state
| State | Indicative range, per job | Get quotes |
|---|---|---|
| New South Wales | $460 to $1,380 | Dilapidation report in Sydney |
| Victoria | $450 to $1,345 | Dilapidation report in Melbourne |
| Queensland | $420 to $1,260 | Dilapidation report in Brisbane |
| Western Australia | $440 to $1,320 | Dilapidation report in Perth |
| South Australia | $390 to $1,175 | Dilapidation report in Adelaide |
| Tasmania | $410 to $1,225 | Dilapidation report in Hobart |
| Northern Territory | $450 to $1,345 | Dilapidation report in Darwin |
| Australian Capital Territory | $430 to $1,295 | Dilapidation report in Canberra |
Each link opens the dilapidation report page for that city, with prices and a quote form.
Other inspections & compliance prices
Every inspections & compliance job and price
How we estimate these prices
These ranges are indicative, not quotes. They reflect the spread of prices businesses typically quote for dilapidation report across Australian capital cities, reviewed by our editorial team in September 2026. All figures are GST-inclusive, for a standard residential job with reasonable access, and are shown per job.
The state figures apply a cost index for each capital city to the national range, so regional prices can sit outside them. Your job could too: size, access, materials and urgency all move the price. The only way to know what your job costs is to get two or three quotes and compare, which you can do here for free.
Get exact quotes, free
Prices vary by job. Describe yours once and independent local businesses that cover your area reply with quotes to compare.
FAQs
How much does dilapidation report cost?
As a guide, dilapidation report costs $400 to $1,200 per job in Australia, GST inclusive. Across the capital cities the range runs from $390 to $1,380 per job. The final price depends on the size of the job, access and materials.
Do these prices include GST?
Yes. Every figure on this page is GST-inclusive. Check that each written quote says whether GST is included before you compare them.
What does a typical job include?
The range assumes a standard residential job with reasonable access. Bigger jobs, hard access, premium materials or urgent work push the price up. A written quote should list what is included.
Why do quotes for the same job differ?
Businesses price their travel, insurance, licences and overheads differently, and they may read the job differently. Compare quotes line by line: what is included, the materials, the warranty and when payment is due.
Sources
The rules, award wages and other facts quoted on this page come from these sources, checked September 2026. We link the page we read, not a homepage, so you can check each one yourself. The price ranges are our own estimates and do not come from these sources. How we research prices.